

A document about the installation of a 1.5 million volt generator that was built in the hall of the Brno Exhibition Center to test the insulation of long-distance high-voltage power lines.
Director
Richard Kubeš
No ratings yet
Sign in to join the discussion — comments are spoiler-gated to your watch progress.
Discussion starters